Fire Remediation Works at Belarmine, Dublin 18
Value
Estimated€1,600,000 · 1,600,000 EUR
Awarded—
Who already wins at this buyer
Firms with recorded awards from Clúid Housing Association in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| Castlethorn Developments Luttrellstown Limited | 1 | €91,511,060 | 2026-06-03 |
| Somerton II Residential DAC | 1 | €25,841,194 | 2026-05-11 |
| GEM Construction Limited | 1 | €19,181,899 | 2026-05-11 |
| CCM Smarthome Developments Limited | 1 | €12,918,062 | 2026-05-28 |
| Ormonde Homes (Breagagh) Limited | 1 | €7,627,978 | 2026-06-25 |
Full buyer profile: what Clúid Housing Association buys and who wins it →
CPV codes
45300000 Construction work45400000 Construction work45343100 Construction work45312100 Construction work44221220 Construction materials & structuresDescription
The project involves the execution of fire remediation works to an existing 53-unit residential development located at Belarmine Ave, Stepaside, Dublin 18, on behalf of the client, Clúid Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire protection and life safety standards outlined in TGD Part B (Fire Safety) of the Building Regulations and other relevant codes such as IS 3218:2913 for fire alarm systems. The development consists of occupied apartment units located above a ground floor level containing commercial units, which are excluded from the scope of this contract. The scope of the remediation works includes, but is not limited to: • Installation of fire-stopping systems at service penetrations and wall/floor junctions. • Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. • Retrofitting of cavity barriers around gas flues and at every floor level. • Building a bin store in the basement with a ventilation system. • Fire alarm cable rerouting and improvements to service risers and shafts. • Sealing of socket/switch boxes within fire-rated partitions. • General improvement of compartmentation and passive fire protection measures. All works will be undertaken within a live residential environment, requiring a high level of coordination to minimise disruption to residents.