CABLE PLOUGHING - STRENGLÖGN -Vatnshamrar að Seleyri - Vesturland
Buyer
NameRARIK ohf.
CountryIS
Published2026-05-19
Deadline2026-06-19
Value
Estimated—
Awarded—
CPV codes
45231400 Construction workDescription
The project comprises one work site; however, the cable installation is divided into two sections: firstly, a new main distribution cable installation and secondly, a cable intended to replace the existing overhead line. One pad-mounted substation shall be installed along the route. The scope of works includes installation of: six (6) single-core 1x240 mm² 36 kV high-voltage cables over approximately 10 km; and three (3) 150 mm² 24 kV high-voltage cables over approximately 7 km. Accordingly, a total of six to seven (6–7) cables shall be simultaneously ploughed and installed in parallel over an approximately 10 km section. The Purchaser also requests installation of fibre optic ducting in parallel with the works. It is anticipated that the works will commence on 10 August 2026 and be completed within 10 weeks thereafter. The commencement date may be delayed should the cables not arrive in Iceland in due time. In such event, the contract period shall be extended correspondingly to reflect the delay.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-05-06 | 26012 - CABLE PLOUGHING - STRENGLÖGN - JÖKULDALUR 1 | RARIK ohf. IS | 92% |
| 2026-05-08 | 26013 CABLE PLOUGHING - STRENGLÖGN - Jökuldalur 2 - Austurland | RARIK ohf. IS | 92% |
| 2026-06-18 | E9451 - Operation and maintenance contract - Electro contract Trøndelag 2026 - 2031 | Statens vegvesen NO | 88% |
| 2026-06-12 | Purchase of a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS) for the supply of electrical power to cruise ships in Port of Skagen. | Skagen Havn DK | 88% |
| 2026-06-12 | Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722 | Energinet Eltransmission A/S DK | 88% |
| 2026-05-18 | Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722 | Energinet Eltransmission A/S DK | 88% |