← Back to explorer

Copenhagen - New Metroline, M5 Transportation System

TED · 447896-2026cn-standardNo deadline given

Buyer

NameMetroselskabet I/S

CountryDK

Published2026-06-30

Deadline

Value

Estimated

Awarded

CPV codes

45234123 Construction work45000000 Construction work45213320 Construction work45234100 Construction work45234120 Construction work45234122 Construction work45234180 Construction work45316200 Construction work45316210 Construction work45316213 Construction work34621200 Transport equipment34622100 Transport equipment34632000 Transport equipment34632200 Transport equipment34632300 Transport equipment34940000 Transport equipment34942000 Transport equipment34943000 Transport equipment50220000 Repair & maintenance services50222000 Repair & maintenance services34620000 Transport equipment50224000 Repair & maintenance services50224200 Repair & maintenance services71311100 Architecture, engineering & inspection71311230 Architecture, engineering & inspection

Description

This tender presents a substantial opportunity for prospective contractors to bid for the M5 Transportation System South package (TSS), a critical component of the Copenhagen metro system's expansion. This project is of significant strategic importance, as the M5 line is a fully automated driverless metro system that will not only enhance passenger service on existing metro corridors but is also planned to extend connectivity to emerging urban development areas, including Kløverparken, Refshaleøen, and Lynetteholm in the East Harbour. The M5 is to operate as an independent system, ensuring that its construction and subsequent operation do not disrupt the existing M1-M4 metro lines. The current tender, Phase 1, encompasses the southern section of the line, from København H to north of v/Prags Boulevard, with an anticipated operational commencement in 2036. The broader vision includes the northern section with an anticipated operatonal commencement of the last part of the northern section in 2045 (included in the transportation system contract (TSS-contract) as options) and a potential future extension to form a ring line, signifying a long-term commitment to urban mobility. The procurement comprises the following, together constituting a mixed procurement within the meaning of Article 5 (2) of the Utilities Directive: 1) A TRANSPORTATION SYSTEM for M5 south encompassing the subsystems rolling stock (passenger vehicles, service vehicles and rescue trolleys), railway infrastructure (signaling system and other subsystems, excluding permanent way and power supply "on the line"), and a CMC (control and maintenance center). Furthermore, O&M supplies (supplies related to the O&M providers operation and maintenance activities such as maintenance plans and training). “On the line” refers to deliveries outside the CMC (as the Transportation System Contractor (TSC) is itself responsible for power supply and permanent way within the CMC). The integration of the mentioned TS-subsystems and the integration of the scope of supply of the CWC into the Transportation System (including but not limited to permanent way and power supply on the line) is also part of the TSC's responsibilities and forms part of the TSS-contract. Rolling stock, railway Infrastructure and the CMC are further described in M5-2-TSS-SW (Scope of Work) of the tender material. 2) MAINTENANCE SERVICES following hand over of the Transportation System related to the continued maintenance of the Transportation System (hereinafter Maintenance Services). The TSS-contract covers both the Transportation System and the Maintenance Services. The Maintenance Services are governed by a separate maintenance contract forming an attachment to the TSS-contract (hereinafter Maintenance Contract) The purchase of the Transportation System and the Maintenance Services should therefore be seen as a whole and only one Tenderer will be awarded the contracts. The expected scope and characteristics of the two contracts are described in the tender material. 3) OPTIONS Three (3) options are included in the TSS-contract: Option 1: The purchase of 5 additional passenger vehicles. Option 2: The extension of the transportation system from Prags Boulevard to Refshaleøen. Option 3: The extension of the transportation system from Refshaleøen to Lynetteholm. Metroselskabet’s requirements relating to the Transportation System are set out in the tender documents, including the draft TSS-contract and the Scope of Works document (M5-2-TSS.SW). Requirements may be developed and changed during the competitive dialogue. As regards the Maintenance Contract, no draft contract or draft specifications are included in the Tender Documents at this stage. This reflects the fact that a central element of the competitive dialogue will be to explore the scope and structure of the Maintenance Contract, including the distribution of maintenance tasks between the TS Contractor and the future operator of the Transportation System (hereinafter the OAMC). As a central element of the dialogue phase, the Employer wishes to explore the advantages and implications of possible distributions of maintenance tasks between the TS Contractor and the OAMC and the technical, commercial and legal terms that will be relevant depending on the maintenance model chosen. The potential models to be discussed and assessed during the dialogue phase are expected to span from a scope of the Maintenance Contract similar to TSSSA models (“Technical Support and Spares Supply Agreements”) to a scope similar to FSA models (“Full Service Agreements”) whereby the Employer would procure most goods, works and services needed for the maintenance and continued development of the Transportation System from the TS Contractor. However, also models which are “in between” or a model where the scope will change over time may be chosen. Also the options to purchase additional passenger vehicles and options covering the extension of the line (northern section) are subject to dialogue. Both technical and commercial requirements are expected to be discussed including elements related to pricing. For further detailing of items planned to be subject for dialogue, reference is made to the Instructions to Tenderers (M5-0-TSS-ITT).

Similar tenders

Closest by meaning — across languages, via embeddings.

PublishedTitleBuyerMatch
2026-06-30Copenhagen - New Metroline, M5 Civil Works SouthMetroselskabet I/S DK95%
2026-06-12M5 – New Metro Line – Invitation to Information Meeting on Prequalification and Tender for Transportation SystemsMetroselskabet I/S DK93%
2026-06-12Copenhagen - New Metroline M5 Civil Works South – Invitation to Information MeetingMetroselskabet I/S DK92%
2026-06-24Day centre transport by minibus of persons with dementia and disabilities.Oslo kommune v/ Bydel Grünerløkka NO88%
2026-05-11Procurement of electric apron buses for Copenhagen Airport - Re-TenderKøbenhavns Lufthavne A/S DK88%
2026-05-06Road lighting control systemHarstad Kommune NO88%

Source

View the official notice on TED