← Back to explorer

9095.100 (Høring) - The Third Limfjord Link - Fjord Crossing (Hearing)

TED · 448638-2026pin-onlyNo deadline given

Buyer

Name

CountryDK

Published2026-06-30

Deadline

Value

Estimated

Awarded

CPV codes

45000000 Construction work

Description

General information about the project: Pursuant to Act No. 624 of 11 June 2024 concerning the construction of a third Limfjord link, the Danish Road Directorate is constructing an approximately 20 km four-lane motorway connecting to the E45 “Nordjyske Motorvej” in the south and the E39 “Hirtshalsmotorvejen” in the north. The motorway will run west of Aalborg and cross the island of Egholm. The motorway will pass beneath the southern branch of the Limfjord (Sønderdyb) through a tunnel and cross the northern branch (Nørredyb) via low-level bridges. In addition to the approximately 2 km tunnel beneath the southern branch of the Limfjord, the project includes approximately 18 km of motorway in open countryside with two motorway interchanges, five junctions, relocation of a number of local roads and paths, demolition of bridges, reconstruction and widening of bridges, installation of noise barriers, and approximately 55 new structures, including three railway bridges, two valley bridges (twin bridges), two low-level bridges (twin bridges), and a pile-supported deck. The project also includes land reclamation in an area of the Limfjord south of Egholm. The tunnel structure consists of an immersed tunnel as the “main tunnel”, connected to the open tunnel ramps at each end via a cut-and-cover “transition tunnel”, together with associated technical buildings, tunnel basins, pumping stations, and mechanical and electrical installations (M&E). ________________________________________________________________________________________________________ Specific information regarding the contract: The contract includes construction of: • The section from approximately km 108.100–112.600, including the immersed tunnel, cut-and-cover “transition tunnel”, and tunnel ramp structure (including M&E and technical buildings), land reclamation, coastal embankment and replacement habitats, roadworks, drainage works (including stormwater retention basin), fauna crossings and a bridge over a local road on the island of Egholm, as well as the two parallel low-level bridges over Nørredyb, each approximately 660 m in length. ________________________________________________________________________________________________________ The contract includes the following works: • Site establishment • Preparatory works • Temporary works necessary for completion of the project • Civil engineering works (earthworks, bridges, tunnel and roads, drainage, technical buildings) • Specialist works (marine works, immersion of tunnel elements) • Mechanical and electrical installations • Utility works • Environmental mitigation and protective measures • Completion works (pavement, signage, safety equipment) ________________________________________________________________________________________________________ Procurement timetable: The contract is expected to be tendered in the third quarter of 2026. ________________________________________________________________________________________________________ Prior to the publication, the Danish Road Directorate wishes to invite potential tenderers and other interested parties to comment on the current draft minimum selection criteria. The purpose of this is to obtain feedback that may be taken into account in the finalisation of the requirements. The aim is to ensure that the Minimum requirements, within the framework of the project, are market-compliant and well balanced. ________________________________________________________________________________________________________ The material for the hearing can be found here: https://udbudsportalen.app.vd.dk/da/forthcoming?showDetails=3ade0e78-2022-42c6-b74c-a7fc1b3465b2 ________________________________________________________________________________________________________ Responses to the hearing should be sent to Saleebaan Yusuf at samy@vd.dk, with inbd@vd.dk in copy. Responses must be received no later than the 7th of august 2026.

Source

View the official notice on TED