Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

TED · 356471-2026pin-onlyNo deadline given

Buyer

NameSerbian Railway Infrastructure JSC

CountryRS

Published2026-05-26

Deadline

Value

Estimated

Awarded

CPV codes

45234100 Construction work

Description

The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into three subsections, (sub-section 3.2 Stalać – Đunis is already contracted). The works relate to Sub-sections 3.1 Paraćin–Stalać and 3.3 Đunis–Trupale. Sub-section Paraćin–Stalać is 20.8 km long, while Sub-section Đunis–Trupale is 37.7 km long. A total of nine stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Sub-section 3.1 and 160 km/h for Sub-section 3.3. On Sub-section 3.1, works include 12 grade-separated crossings, 8 bridges and culverts, 2 pedestrian underpasses, 1 retaining wall, and 17 culvert structures beneath the railway track. On Sub-section 3.3, works include 18 grade-separated crossings, 14 bridges and culverts, 2 pedestrian underpasses, 15 retaining walls, 18 culvert structures beneath the railway track, and 2 culvert structures beneath roadways. Across both Sub-sections 3.1 and 3.3, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.

Similar tenders

Closest by meaning — across languages, via embeddings.

PublishedTitleBuyerMatch
2026-05-13Supervision Services for the Construction of new railway section from Kriva Palanka to the border of the Republic of Bulgaria, as part of Corridor VIIIPublic Enterprise for Railway Infrastructure Railways of Republic of North Macedonia -Skopje (ZRSMI) MK89%
2026-06-01Rehabilitation of Railway Line Between Durres and RrogozhineAlbanian Railways - Hekurudha Shqiptare - HSH AL88%
2026-05-26Rehabilitation of 9 Tunnels on the Vrbnica–Bar Railway Line, MontenegroRailway Infrastructure of Montenegro JSC – Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD – Podgorica (ŽICG) ME87%
2026-05-12Supply of equipment – EV ChargersCentre for development of the South-East planning region MK87%
2026-05-04The entrustment of the performance of the activity of urban and suburban passenger transport on the territory of the City of Požarevac through a public-private partnership with elements of concessionCity of Požarevac RS86%
2026-06-08Operation of recycling stations and environment stations with disposal of received waste, as well as operation of the loading station at Rygg.Vestfold avfall og ressurs AS, VESAR NO86%

Source

View the official notice on TED