Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro
Value
Estimated—
Awarded—
WinnerConsortium Hydrophil GmbH/IRD Engineering SrL/Hydrophil D.O.O.
CPV codes
71311000 Architecture, engineering & inspectionDescription
Indicative scope of Works on the project “Supervision of Works for Improvement of the Water Supply System in the Old Royal Capital Cetinje, Montenegro” includes the following elements: • Construction of transmission and distribution mains of diameter DN32 to DN400, with approximate length of 92 km (to be implemented within 5 phases), incl. including house connections and installation of flow meters • Construction of the new reservoir Sandin vrh 1 and booster station Sandin vrh 2 (6th phase) • Reconstruction of the existing water supply network • Reconstruction of the transmission main from BC Lašor to the reservoir Zagrablje • Reconstruction of the pumping station Višnjica and the breaking chamber Velja Gora Works will be implemented according to FIDIC Red Book (1999 ed). The supervision of Works shall be implemented in compliance with the requirements of the Montenegrin legislation and relevant EU requirements. The Consultant must particularly consider licensing and permits requirements in the Law on Construction of Structures in Montenegro in force.