Appointment of an Integrated Design Team for UCC Outdoor Sports Facilities - Phase 1
Buyer
NameUniversity College Cork
CountryIE
Published2026-05-27
Deadline—
Value
Estimated€1,025,000 · 1,025,000 EUR
Awarded€1,025,000 · 1,025,000 EUR
WinnerTOBIN Consulting Engineers_8682
CPV codes
71300000 Architecture, engineering & inspection71320000 Architecture, engineering & inspection71322000 Architecture, engineering & inspection71311000 Architecture, engineering & inspection71312000 Architecture, engineering & inspection71313000 Architecture, engineering & inspection71317100 Architecture, engineering & inspection71317210 Architecture, engineering & inspection71332000 Architecture, engineering & inspection71334000 Architecture, engineering & inspection71200000 Architecture, engineering & inspection71220000 Architecture, engineering & inspection71240000 Architecture, engineering & inspection71420000 Architecture, engineering & inspection71530000 Architecture, engineering & inspection71314000 Architecture, engineering & inspectionDescription
This competition relates to the appointment of an Integrated Design Team for UCC Outdoor Sports Facilities Phase 1. The design team will be procured via an integrated design team approach, with the Civil and Structural Engineer acting as the integrated design team lead. The principal service providers required to form part of the integrated team are • Civil and Structural Engineering Services (CSE) • Architectural Services (AS). • Mechanical and Electrical Engineering Services (MEP). • Project Supervisor Design Process (PSDP). The first phase to be delivered under the developed master plan is to include the following works. • Mardyke Sports Grounds Facility o The resurfacing of the existing synthetic hockey pitch such that it will be converted into a recreational sporting facility, that can be sub-divided by netting. o New changing rooms adjacent the GAA pitch (circa 300m2) o New boat storage area (90m2) o Upgrading of the existing Floodlight lamp heads to LED. • Proposed UCC Sports Park o 2 synthetic soccer pitches, complete with floodlighting and perimeter fence, o 1 synthetic GAA pitch, complete with floodlighting, ball stop netting and perimeter fence, o 2 new water based synthetic hockey pitches, complete with floodlighting and perimeter fence, o Standalone equipment (90m2) and maintenance stores area (90m2), o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2) o All associated site infrastructure, including roads, paths, parking, drainage utilities, biodiversity spaces etc. • The Curraheen Sports Grounds (The Farm). o Installation of new LED floodlights to three pitches, o Upgrading of the existing Floodlight lamp heads to LED to three pitches; and o New modular changing rooms (circa 6-8 dressing rooms, circa 400m2)
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-05-27 | Quantity Surveying Services for UCC Outdoor Sports Facility Phase 1 | University College Cork IE | 97% |
| 2026-06-22 | Establishment of a Single Supplier Framework of MEP Led Design Team for Small and Minor Work Process Projects at Tyndall National Institute, UCC | University College Cork IE | 88% |
| 2026-05-18 | Establishment of Multi Supplier Framework of Project Managers for Buildings and Estates Office, UCC and Project Management Services to Support UCC Capital Programme | University College Cork IE | 88% |
| 2026-05-11 | Provision of Integrated Design Team Services (Lot 1) for Development of a New "One Health" Building on behalf of South East Technological University | South East Technological University (SETU) IE | 88% |
| 2026-05-29 | UCDOPP5582 Integrated Design Team Services for UCD Minor Works / Construction Projects and the UCD Building Care Programme | University College Dublin ( UCD ) IE | 88% |
| 2026-05-27 | 25-022F Provision of Engineering Services | Uisce Éireann IE | 88% |