Construction of Nikšić Wastewater Management System – Sewerage Network Phase II
Buyer
NameNikšić Municipality
CountryME
Published2026-05-15
Deadline2026-06-02
Value
Estimated—
Awarded—
CPV codes
45231300 Construction workDescription
Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corrugated PE pipes is the collector’s material and concrete is the manhole material. - Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of Ø200 mm with a length of 165 m. The wastewater will be pumped through the pressure line to the existing pumping station "Duklo". - Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-06-18 | Wastewater collection and treatment investment project in the Municipality of Stip | Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD) MK | 89% |
| 2026-06-19 | Connection of Vinica to WWTP Kocani, including partial rehabilitation and extension of sewarage and stormwater systems in the Municipality of Vinica | Government of North MacedoniaMinistry of Finance, Central Financing and Contracting Department (CFCD) MK | 89% |
| 2026-06-15 | New Rjukan treatment facility, collaboration contract | Tinn kommune NO | 87% |
| 2026-06-22 | WSC/T/035/2026 - WORKS – UPGRADING OF POTABLE WATER TRUNK MAIN AND NETWORK BETWEEN SELMUN AND XEMXIJA BY THE WATER SERVICES CORPORATION | Water Services Corporation MT | 87% |
| 2026-06-15 | Cleaning, Imaging and Analysis of Sewer Pipes | Veitur ohf. IS | 87% |
| 2026-05-08 | E24 Pumping stations and valve manholes 3 – The transfer plant (Kongshaugen treatment facility). | Ålesund kommune v/Vatn og Avløp NO | 87% |