Supply of the ITER Neutral Beam Magnetic Shielding
Buyer
NameThe European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
CountryES
Published2026-11-13
Deadline—
Value
Estimated—
Awarded—
Who already wins at this buyer
Firms with recorded awards from The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| BERTIN TECHNOLOGIES S.A.S. | 1 | €3,626,916 | 2026-07-01 |
CPV codes
42150000 Industrial machinery42000000 Industrial machinery31630000 Electrical machinery & lightingDescription
Supply of Neutral Beam Magnetic Shielding units (expected 2 units, up to a maximum of 3 units). Each system includes 9 resistive magnets and a passive shield composed by iron and carbon steel plates. Supply is based on build to print specification and include manufacturing design, procurement, manufacturing, factory assembly and testing, documentation and shipping to ITER. Typical coil dimension 4mx4m, 3 tons of copper conductor. Overall dimension of one shield is 15m x 5m x 5m, with a mass of 600 tons. Part of the passive shield has also nuclear safety function, being support of the Neutral Beam Vessel, and shall be manufactured according to RCCMR 2007 (support section). Material shall follow ITER requirement on impurities.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-06-30 | Supply of cryopumps for the ITER Heating and Diagnostic Neutral Beam System | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 89% |
| 2026-05-27 | On site activities services and design, manufacture and supply of Test Coils | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 89% |
| 2026-11-09 | On site support activities and supply of Test Coils | European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) ES | 88% |
| 2026-08-31 | Mechanical Analysis for ITER Components | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 88% |
| 2026-09-09 | Procurement of Tungsten raw material for the JT-60SA Actively Cooled Divertor | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 87% |
| 2026-11-09 | Provision of Nuclear Safety I&C Consultancy, Design and Qualification Services | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 87% |