Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Value
Estimated€400,000 · 400,000 EUR
Awarded—
Who already wins at this buyer
Firms with recorded awards from Donegal County Council_1193 in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| Source Civil Ltd | 1 | €883,522 | 2026-07-01 |
| T and L Gallagher LTD | 1 | €401,280 | 2026-07-01 |
| Farrell Contracts Ltd | 1 | €373,000 | 2026-06-30 |
| Garden Escapes | 1 | €370,776 | 2026-07-07 |
| Thomas patton construction ltd | 1 | €275,000 | 2026-07-03 |
Full buyer profile: what Donegal County Council_1193 buys and who wins it →
CPV codes
45000000 Construction work45331110 Construction workDescription
Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.