Manufacturing, Assembly of Leak Detection Systems
Buyer
NameThe European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
CountryES
Published2026-11-26
Deadline—
Value
Estimated€4,000,000 · 4,000,000 EUR
Awarded€3,856,591 · 3,856,591 EUR
WinnerREVOL TT Consulting s.r.o
Who already wins at this buyer
Firms with recorded awards from The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| BERTIN TECHNOLOGIES S.A.S. | 1 | €3,626,916 | 2026-07-01 |
| Bertin Technologies SAS | 1 | €2,491,504 | 2026-11-26 |
CPV codes
42530000 Industrial machineryDescription
The scope of this procurement is the manufacturing design, procurement, manufacturing, assembly, testing and delivery to ITER Site of the primary vacuum and cryostat leak detection systems for ITER, consisting of: a) Primary Vacuum Leak Detection System: 1. Torus Direct Leak Detection System, 2. Neutral Beam Direct Leak Detection System, 3. Leak Calibration System, 4. Gas Analysis System, - Remote Leak Detection System, which comprises: 5. Torus and Neutral Beam Remote Leak Detection Station, 6. Active SVS Remote Leak Detection Station, b) Cryostat Leak Detection Systems: 7. Cryostat Leak Detection System, 8. Cryostat Remote Leak Detection System, also called Non-active SVS Remote Leak Detection System.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-06-30 | Supply of cryopumps for the ITER Heating and Diagnostic Neutral Beam System | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 90% |
| 2026-05-27 | On site activities services and design, manufacture and supply of Test Coils | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 89% |
| 2026-06-22 | Provision of mechanical works | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 89% |
| 2026-08-31 | Mechanical Analysis for ITER Components | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 89% |
| 2026-07-01 | Multiple framework contracts in cascade for the development and supply of the ITER in-vessel viewing and metrology system (IVVS) | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') ES | 88% |
| 2026-11-26 | On site support activities and supply of Test Coils | European Joint Undertaking for ITER and the Development of Fusion Energy (F4E) ES | 88% |