MISSION DE MAITRISE D'OEUVRE RELATIVE A LA REHABILITATION DU RESERVOIR 10 000 N°2 (ET DU RESERVOIR 10 000 N°1) – STATION DE PRODUCTION D’EAU POTABLE DE LA BASTIDE - PHASE CANDIDATURE
Value
Estimated—
Awarded—
Who already wins at this buyer
Firms with recorded awards from LIMOGES METROPOLE - Communauté urbaine in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| CABINET DUARTE | 1 | — | 2026-08-05 |
| GEOTEC | NEXTROAD ENGINEERING | 1 | — | 2026-08-05 |
Full buyer profile: what LIMOGES METROPOLE - Communauté urbaine buys and who wins it →
CPV codes
71241000 Architecture, engineering & inspection71300000 Architecture, engineering & inspection71311000 Architecture, engineering & inspection71313000 Architecture, engineering & inspectionDescription
Des travaux de de réhabilitation sont nécessaires sur les deux ouvrages de stockage d’eau potable de 10 000 m3 de la station de production d’eau de La Bastide. Le présent marché permettra de désigner un maitre d’œuvre qui assurera le pilotage des études et des travaux pour la réhabilitation pérenne des réservoirs afin de réduire leur vulnérabilité.
Similar tenders
Closest by meaning — across languages, via embeddings.