Emission reduction maintenance dredging operations Rotterdam
Buyer
Name—
CountryNL
Published2026-05-05
Deadline—
Value
Estimated€1 · 1 EUR
Awarded—
CPV codes
45240000 Construction workDescription
To make dredging operations more sustainable, HbR and RWS intend to jointly tender Lot 3 as a frontrunner project. The ambitions for this lot focus on emission reduction in dredging operations, with CO2 eq., NOx, and PM10 (greenhouse gases, nitrogen oxides, and particulate matter, respectively) serving as key areas of focus, in accordance with the SEB covenant. At present, no medium-sized trailing suction hopper dredger is available that can operate continuously on Renewable Fuels of Non-Biological Origin (RFNBOs) or Renewable Electricity (RE). The frontrunner project aims to stimulate the development of such equipment and deploy it within a multi-year contract, with a significant application of RFNBO/RE.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-06-22 | Dense phase CO2 pumps | N.V. Nederlandse Gasunie NL | 85% |
| 2026-06-11 | Tender for Contract on subsidy for carbon capture, transport and storage | The Danish Energy Agency (Energistyrelsen) DK | 85% |
| 2026-06-18 | Consultancy Services to prepare Regional Renewable Energy Strategies for the Eastern and Midlands Regional Assembly, Northern and Western Regional Assembly and Southern Regional Assembly. | Southern Regional Assembly IE | 85% |
| 2026-05-27 | (26/38) Refuse collection vehicles, framework agreement | Sirkula IKS NO | 85% |
| 2026-05-26 | Procurement of Open-path Ammonia (NH3) Gas Analyzer and Methane (CH4) + Nitrous Oxide (N2O) + Water Vapour (H2O) Analyzer for Eddy Covariance Flux Studies in Natural Resources Institute Finland | Luonnonvarakeskus FI | 85% |
| 2026-05-12 | Request for Information (RFI) - possibility for delivery to the existing system | Oslo kommune v/ Renovasjons- og gjenvinningsetaten NO | 85% |