Airfin-coolers
Who already wins at this buyer
Firms with recorded awards from N.V. Nederlandse Gasunie in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| Berko Noord B.V. · KvK 09183463 | 1 | — | 2026-08-06 |
| e-Power B.V. · KvK 37091477 | 1 | — | 2026-08-06 |
Full buyer profile: what N.V. Nederlandse Gasunie buys and who wins it →
CPV codes
31161200 Electrical machinery & lighting31140000 Electrical machinery & lightingDescription
We need three types of airfin coolers. • An airfin-cooler for the triethylene glycol (TEG) unit: Each TEG unit will be equipped with an airfin-cooler upstream of the absorption column. The aim is to cool the hydrogen gas from the cavern before it enters the absorption column. • An airfin cooler for the intermediate stage hydrogen compressors: Each compressor is fitted with an airfin cooler in the intermediate stage. Its purpose is to cool the compressed hydrogen. • An airfin cooler for the discharge of the hydrogen compressors: Each compressor will be equipped with an airfin cooler in the discharge. The purpose is to cool the compressed hydrogen. The supplier must carry out the engineering, manufacturing, inspection, transport, delivery, installation, commissioning, testing and operational field acceptance test. Gasunie will carry out preventive maintenance itself and corrective maintenance can be placed with the supplier, as can the supply of any spare parts. Q2 2027: Airfin-cooler TEG: 2 pieces. Airfin-cooler compressor first stage: 2 pieces. Airfin-cooler compressor second stage: 2 pieces. Later delivery > 2030. Airfin-cooler TEG: 1 piece. Airfin-cooler compressor first stage: 3 pieces. Airfin-cooler compressor second stage: 3 pieces.
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-07-08 | NL-Petten: New gas detection system and maintenance services for GASTEF | European Commission, DG JRC - Joint Research Centre NL | 85% |
| 2026-05-26 | Bovine Respiration and Calorimetry Chambers | Teagasc - the Agriculture and Food Development Authority IE | 85% |
| 2026-06-15 | Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra | European Commission, DG JRC - Joint Research Centre IT | 85% |
| 2026-06-10 | CT3033/2026 - TENDER FOR THE SUPPLY, DELIVERY, INSTALLATION, AND COMMISSIONING OF ONE (1) NINE-BODY MORTUARY REFRIGERATOR UNIT AND ONE (1) THREE-BODY MORTUARY FREEZER UNIT FOR GOZO GENERAL HOSPITAL | Department of Contracts MT | 85% |
| 2026-07-06 | Data centre rack and cooling components | — CH | 85% |
| 2026-07-21 | Convection parts (boiler tubes) for Unit 1 in the Uppsala Waste incineration plant | Vattenfall AB Procurement Heat Sweden SE | 85% |