Superheater outlet steam headers at Avedøre Power Plant in Denmark.
Value
Estimated—
Awarded€976,628 · 7,300,000 DKK
Who already wins at this buyer
Firms with recorded awards from Ørsted Bioenergy & Thermal Power A/S in this tender’s CPV categories — the incumbents you are bidding against.
| Firm | Wins | Awarded | Last win |
|---|---|---|---|
| Lydall Gutsche GmbH & Co. KG | 2 | — | 2026-06-09 |
| Ansaldo Energia | 1 | €804,860 | 2026-06-04 |
| Ellegaard InduMove A/S | 1 | — | 2026-05-20 |
Full buyer profile: what Ørsted Bioenergy & Thermal Power A/S buys and who wins it →
CPV codes
42162000 Industrial machineryDescription
The contract covers manufacture, testing and delivery of replacement outlet steam headers, transition pieces and part of connection tubes or the superheater HT3 outlet located at Avedøre Power Plant. The replacement is required following a steam leak incident and subsequent inspections where cracking indications were identified in dissimilar metal transition welds at the superheater HT3 outlet. The replacement is intended to restore pressure integrity and reduce the risk of further high pressure steam releases. A steam header is a thick walled manifold/collector that gathers steam from multiple tubes and distributes it onward, operating at very high pressure and temperature. Specifically, the contract covers the following supplies and services: Supply: • Complete 28 outlet headers according to BWE’s drawings, including transition pieces and part of connection tubes • Manufacturing activities including design, materials, welding, NDT, pressure testing and delivery Services: • Detail engineering • Supply of materials • Production and welding • Project management • PTS for purchase of materials • PMA for ASME SA-335 gr. P92 • PMA for ASME SA213 TP347HFG (if needed) • Heat treatment • NDT inspection according to WTP and applicable boiler standards (as per DKF) • Pressure testing • NoBo inspection • Workshop visits during manufacturing • FAT supervision • Temporary corrosion protection • Transportation to site
Similar tenders
Closest by meaning — across languages, via embeddings.
| Published | Title | Buyer | Match |
|---|---|---|---|
| 2026-06-09 | Preliminary Market Consultation for a 30 MW battery energy storage system (BESS) in Iceland | Landsvirkjun IS | 87% |
| 2026-07-21 | Convection parts (boiler tubes) for Unit 1 in the Uppsala Waste incineration plant | Vattenfall AB Procurement Heat Sweden SE | 87% |
| 2026-07-08 | 2027 Major Overhaul of Allen LP Steam Turbine, Gearbox and Generator | Maabjerg Energy Center – BioHeat&Power A/S DK | 87% |
| 2026-06-18 | Framework agreement contracts - Welding and muffing district heating | LYSE NEO AS NO | 87% |
| 2026-07-06 | Preliminary Market Consultation for Steam Control Valves | Landsvirkjun IS | 86% |
| 2026-06-29 | Prequalification: Ground work and construction of a transformer building as well as the establishment of cable trenches - Haugaland Næringspark | FAGNE AS NO | 86% |